Feasibility & project report
Market, raw-material and capacity study, with a bankable project report and realistic return figures before you commit capital.
Project report
From feasibility and plant layout to commissioning — one accountable team taking your rice mill from idea to production, with advice you can plan around.
Machines, ducting, power and controls are usually planned by different people and blamed on each other when something fails. We plan the whole line together, manage the build, and stay accountable after handover.
Machines, ducts and clearances resolved before fabrication.
Schedules, vendors, civil and erection coordinated.
Testing, training and 12 months of backup.

An illustrative plant: every site is laid out around your capacity, your paddy type and the land you have.
Practical consultancy for new rice mills and for existing mills that want better yield, lower running cost and fewer breakdowns.
Market, raw-material and capacity study, with a bankable project report and realistic return figures before you commit capital.
Project reportRight-sizing the plant for your paddy variety, running hours and product mix — raw or parboiled, one pass or two.
Capacity sheetMaterial flow, building and civil loading drawings, utilities and future expansion planned together.
Layout drawingsFor existing mills: where head-rice yield, power and husk are being lost, and what to change first.
Loss auditSchedules, vendors, civil work and erection coordinated so the plant is ready when the paddy arrives.
Schedule & trackingTrial runs, tuning, operator training and a documented handover with follow-up support.
Handover fileA structured, proven methodology — typically 3 to 4 months from documentation to handover.
We study your requirements, capacity targets and site conditions.
Plant layouts, equipment selection and civil loading drawings.
Equipment ordered, tracked and delivered to the plant schedule.
Erection, alignment and integration by our own engineers.
Testing, operator training and a clean handover with support.
Paddy that is dried slowly and evenly breaks less in the mill. Rushing the drier is the quickest way to lose head rice.
Every extra whitening pass costs power and head rice. Match the passes to the variety and to the market you sell to.
Husk is about a fifth of the paddy by weight and a ready fuel. Using it well can power drying and parboiling.
Good dust control protects machines, people and product quality. Design it in from the first drawing, not after.
“Great work bro”


Feasibility, plant layout, process design and commissioning — tell us about your rice mill project and we’ll respond within 24 hours.